|
CDC 02-28-2023 Lions Club Road 036E 008 COA applicaton
Approved. The Certificate of Appropriateness was granted subject to the following conditions, clarifications, or changes to the submitted application: the proposed landscaping around the entire perimeter of the project will be installed in conjunction with the construction of the first building; if fencing is required around the detention pond, it will be a 6’ high, black vinyl coated, chainlink fence; the irrigation and lighting plans will reviewed by staff; the dumpster enclosure will be constructed as presented at the meeting.
|
|
CDC 01-24-2023 2091 Eatonton Road - Sleep Inn - COA application revised 01-18-2023
Approved. The Certificate of Appropriateness was granted subject to the following conditions, clarifications, or changes to the submitted application: the front elevation will be executed as approved at the October 25, 2022, meeting, i.e. the full height of the first floor will be veneered in brick; brick veneer at this height will wrap both sides to the point of the stair entrance.
|
|
CDC 01-24-2023 1310 Monticello Road - Bard Mfg. - COA application
Approved. The Certificate of Appropriateness was granted subject to the following conditions, clarifications, or changes to the submitted application: the brick columned fence design will be used on the front span; the fence will be painted to match the building; the screening vegetation will be reviewed administratively.
|
|
CDC 09-27-2022 1310 Monticello Road
Approved. The Certificate of Appropriateness was granted subject to the following conditions, clarifications, or changes to the submitted application: substantial evergreen vegetation will be planted to screen the wall facing Monticello Road.
|
|
CDC 06-28-2022 1330 Eatonton Road
Approved with the following conditions: 1) The paint color for the parapet will be reviewed by staff; 2) Lap board siding of the parapet will be fiber-cement board; 3) The window framing will be dark in color; and 4) This approval is only for the addition to the existing building, changes in the site (pavement, vegetation, etc.) and the construction of the pump canopy will be reviewed at a future meeting.
|
|